Scenario
Decision Context
Decivra Review Sequence
Review sequence completed. Re-run to replay the staged pipeline.
- Decision request received
- Key information extracted
- Missing information identified
- Similar decisions found through Decision Replay™
- Risk register generated
- Challenge Agent review completed
- Decision DNA™ calculated
- Decision Confidence™ calculated
- Recommendation produced
Executive Recommendation
Splitting high-risk workpacks into a second window protects safety readiness and reduces critical-path risk.
Top risks
- Contractor availability tight on critical path
- Permit readiness incomplete on two workpacks
- Safety escort coverage under review
Required actions
- Reconfirm contractor capacity and float
- Finalise safety permit matrix
- Split high-risk workpacks into second window
Decision Replay™
- 12024 Plant Shutdown — contractor overrun delayed restart
- 22025 Maintenance Campaign — early permit planning reduced downtime
- 32023 Emergency Shutdown — scope creep increased cost exposure
What-If Simulator
Adjust priorities to reshape the recommendation.
Ask Decivra
Agent Review Panel
Specialist review lanes
Each agent reviews the decision from its own discipline. Findings and escalations are auditable.
- Commercial Agent
Margin target achievable; scope volatility needs a change-order ceiling.
Conf.82% - Engineering Agent
Tool string capability confirmed; secondary string availability unverified.
Conf.78% - Finance AgentEscalation
32% PLN exposure — treasury hedge review required.
Conf.74% - Legal AgentEscalation
MSA amendment pending; liability clause under counsel review.
Conf.68% - Operations Agent
Mobilisation window feasible with 4-week lead on wireline unit.
Conf.85% - Knowledge Agent
Three prior Geofizyka projects matched via Decision Replay™.
Conf.88% - Challenge AgentEscalation
Recommendation depends on unverified secondary tool string.
Conf.62% - Chief Decision Agent
Proceed with Conditions — three required actions must clear before approval.
Conf.82%
Challenge Agent Summary
Decivra recommends "Delay High-Risk Workpacks", but the recommendation depends on the required actions clearing before executive sign-off. Without them, this should fall to Review Required.
- Hidden assumptions in supplier / resource availability
- Failure path: unresolved conditions at approval gate
- Unverified dependencies flagged by specialist agents
- Evidence gaps in Decision Replay™ matches
Most Likely Failure Scenario
- Failure path
- Decision proceeds without the required conditions closing. The operations team is exposed to the top risks identified above.
- Trigger
- Approval gate passed before conditions are cleared.
- Business impact
- Value at risk and schedule slippage against plan.
- Prevention
- Close all required actions and complete Challenge Agent review before executive sign-off.
Data Privacy Guardrails
Each customer workspace is isolated. Uploaded RFQs, pricing sheets, contracts and project documents are processed inside the customer’s dedicated environment and are not used to train external language models.
Executive sign-off
Two endorsements received · one signature outstanding
By committing, you attest that the Decision DNA™ inputs, risk register and required actions have been reviewed in line with Decivra Intelligence governance policy KIG-0042.